A survey is only as useful as the report you get at the end of it. Facilities managers and operations directors are often asked to approve an estate-wide programme without seeing what lands on their desk afterwards. So here is exactly what an air conditioning condition survey report from AKS contains, how to read it, and how it turns into decisions and budgets.
The short version
After our engineers have visited every site and logged every indoor and outdoor unit, you receive four things: an individual health check report for each site, an estate-wide summary with a site-by-site register, a prioritised plan, and costed remedial quotes. The reports belong to you and can be used with any contractor. You can see the full scope on our AC Health & Condition Survey page.
1. The individual site report
Each site gets its own health check report. For every indoor and outdoor unit, the engineer records:
- Make, model and serial number.
- Manufacture date.
- Unit type.
- Refrigerant type and charge.
- A condition grade, with notes and any critical parts needed.
The site manager or regional lead can read this without a technical background: what is there, what state it is in, and what needs attention.
2. The 1–5 condition grade
Every unit is graded on a simple scale, so that a unit at one site can be compared directly with a unit at another.
| Grade | Meaning |
|---|---|
| 1 | Poor |
| 2 | Below average |
| 3 | Average |
| 4 | Good |
| 5 | New |
The grade reflects the condition our engineer actually finds on the day, not an assumption based on a label. The condition notes explain the reasoning, and flag any critical parts that would be needed to keep a unit running.
3. The estate summary and register
This is the document finance and operations teams tend to use most. It brings every site together into one estate-wide summary with charts, plus a site-by-site register of all units.
To show what that looks like in practice, here is what the summary revealed for a national retailer we surveyed in summer 2026 (anonymised). We covered 67 sites in 51 days and inspected and graded 970 units. Overall, 82% were average condition or better. But 160 units were poor or below average (107 poor, 53 below average), and 70% of those problem units were at just 9 of the 67 sites. Thirty sites had at least one poor or below-average unit; 37 had none. Across the estate, 83 units were recommended for full replacement across 13 sites.
Patterns like that are almost impossible to see from call-out history alone. They become obvious in a register, and they tell you where to point your attention and budget. Our 67-site survey case study looks at what that estate taught us in more detail.
The register also gives you accurate, unit-level asset data, which is a useful by-product if your current records are patchy.
4. The Now / Next 12 months / Ongoing plan
The plan turns the grades into action, split into three horizons:
- Now: urgent replacements, where a unit is at real risk of failing or is already failing.
- Next 12 months: at-risk equipment to budget for in the coming year, so that spend is planned rather than reactive.
- Ongoing: flagged units to monitor at planned maintenance visits, rather than replacing prematurely.
For the example estate, the site status split was 13 sites needing replacement, 38 needing repairs or remedial actions, and 16 all OK. That kind of split lets an operations director brief the board in a few lines and lets finance phase the cost across periods.
5. Costed remedial quotes, site by site
The report does not stop at identifying problems. You receive costed remedial quotes site by site, so each recommendation arrives with a price attached. That means you can approve urgent work quickly, pencil in next year’s budget with real figures, and compare options without waiting for further site visits.
6. Reports you can use with any contractor
The survey data is yours. You are not tied to AKS for the work that follows, and the reports can be used with any contractor. Many clients choose to bring the flagged units into a planned commercial air conditioning maintenance programme, but that is a decision for you, not a condition of the survey.
How the survey is carried out
Visits are scheduled around trading hours and are non-intrusive, so your sites keep operating normally. We cover the whole UK, and AKS has 34+ years’ experience and is a Daikin and Mitsubishi partner. We work with multi-site operators in retail, leisure, hospitality, education, healthcare and property management.
Request a Survey Proposal
If you would like to see what a report would look like for your own estate, call us on 01704 833 755 or request a survey proposal online. Tell us roughly how many sites you have and when your busiest period starts, and we will outline how a survey would work for you. More detail is on the AC Health & Condition Survey page.